With a Modular and compact design, the rigless can be placed in any location even though there is no existing derrick system and surface conductor that cannot sustain the Rig’s weight and stress.
"Zero to Zero" with high performance and safer, well plug and abandonment solutions
EEST own assets and services. Internal resources sharing and maintain will be most solution to manage and control such of NPT.
Our modular rigless pulling unit eliminates rig time, cost impact per well, intervention, and abandonment costs. Our modular and compact rigless technologies can be placed everywhere. There are no existing derrick systems and surface conductors unable to sustain Rig weight and stress. With a self X-Y skidding system and pulling capabilities up to 500,000 lb, our rigless units replace costly Jackup, Tender, and Semi-sub drilling. The hybrid rigless plug and abandonment can utilize offshore and onshore with Turnkey abandonment scope need.



With a Modular and compact design, the rigless can be placed in any location even though there is no existing derrick system and surface conductor that cannot sustain the Rig’s weight and stress.
The self X-Y skidding system and pulling capability of up to 500,000 lb make our Rigless units replace costly Jackup, Tender, and Semisub Drilling. Further, its hybrid feature allows utilization both onshore and offshore.
A unique Internal and External cutter with a Conductor handling system works along with the modular rigless unit, leading to the most operation efficiency, less rig time, and cost-effectiveness.
EEST in-house Engineering, Fabrication, and Inventory management that help minimise any potential downtime event to be "Zero".
The production well economic life eventually ends. EEST dedicated specialists solely focus on well safe and abandonment.
We use the best method and intervention tools to supply full slot recovery or re-use surface casing that meets the client’s compliance standards.
Using a project-management approach, EEST SME’s take you through all phases, from pre-job to contingency planning, compliance, engineering, implementation, and final plug and abandonment.