500K Plug & Abandonment; Rigless P&A unit

2016 - Present

Service Name

:

Project Name

:

500K Plug & Abandonment; Rigless P&A unit

Job Period

:

2016 - Present

Client

:

PTTEP

Location

:

Gulf of Thailand

Work Scope

  • Casing Re-use and Full slot well recovery
  • Cementing/ Cement Balance Casing and Tubing
  • Set Tubing and Casing Bridge plug/Cement Retainer
  • Downhole Cut Tubing/Casing/Surface conductor
  • Pull out Tubing/Casing/Conductor
  • Wireline Punching/Cutting/Fishing
  • Surface Cold cutting
  • Fishing
  • Tubular running and handling
  • Conductor retrieving
  • Set Retrieval test packer
  • Splitter conductor installation

Highlight

  • Average day per well 2.0 days/ well
  • No TRIR & LTI
  • Success downhole mechanical cut 2-7/8″ & 3-1/2″ Tubing, 7″ Casing, 9-5/8″ dual well and surface 26″ splitter conductor
  • Success retrieved parted casing
  • Success splitter conductor designed/fabrication/installation/ and recovering

PTTEP

New
arrival

2019 collection

Let’s face it, no look is really complete without the right finishes. Not to the best of standards, anyway (just tellin’ it like it is, babe). Upgrading your shoe game. Platforms, stilettos, wedges, mules, boots—stretch those legs next time you head out, then rock sliders, sneakers, and flats when it’s time to chill.